Digby Oldridge
A depot engineer, arms folded, in front of a new Class 717 train in the maintenance shed

Inside the depots

Showreel · 1:33Rail depot showreelNinety seconds inside the sheds: pits, lifts, paint booths, cab checks and the trains going back out.
Commission · 3:15Bournemouth depot train repaintThe train repaint programme at Bournemouth depot.
Commission · 3:40Wimbledon Train Care DepotInside the depot where trains are cleaned, checked and repaired.

How it was made

A depot is a hard place to film. It’s dark under the trains and the work doesn’t stop for a camera. So the cameras went where the work goes: down in the pits under the bogies, up on the gantries, and onto a wire run along the shed so a camera could fly the length of a new train and through its gangways.

The people are in it as much as the trains. Fitters, painters, cleaners and stores staff were filmed doing their actual jobs, and photographed where they stand every day.

  • Lifting, painting and washing, all under one roof.

What was delivered

  • Films from individual depots, including the Class 701 film
  • Photographs on the shed floor: people, trains and process
  • A ninety-second depot showreel cut from ten years of footage

Commissions

Got a job in mind?

Tell Digby what it is, where and roughly when. You’ll get a straight answer on how he’d shoot it and what it costs.