Digby Oldridge
A long blue float smooths a new concrete slab under the steel frame of a building

Industry & construction

Industrial and construction photography and film

Building sites, factory floors, depots and foundries. A lot of this work only happens once, so it has to be caught properly the first time.

Heavy lifts and concrete pours don’t get a second take. Timelapse cameras can sit on a site for a year while the stills and film get made on the days that matter.

The engineers and fitters get photographed where they work, for recruitment and reports.

Film

Films

Commission · 1:59Cambridge sidings and Mill Road bridgeThirteen months of timelapse and filming, from old track out to new sidings in use, cut from three films made for the train operator.
Showreel · 1:33Rail depot showreelNinety seconds inside the sheds: pits, lifts, paint booths, cab checks and the trains going back out.

Photography

Construction

Photography

Manufacturing

Photography

Depots and foundries

Case studies

Selected work

All work

Commissions

Got a site or a process that needs recording?

Tell Digby what it is, where and roughly when. You’ll get a straight answer on how he’d shoot it and what it costs.